34FiftyEads
Type of Install:
PVInstallation Date:
2024Installation Location:
Washington D.C.Annual Output:
128,684 kWh
The newly built 34Fifty Apartments project demonstrates a smart approach to sustainable housing. SES partnered with Furbish and MCN Build to install a 101.7 kW solar system on top of a green roof. This project offers a cost-effective solution to stormwater management, reduces energy costs, and generates income through DC’s generous solar incentives.



